After speaking with the vendor support engineer again, we have scheduled a conference call between us, the vendor support engineer, and a Polycom engineer to attempt the MPM-F card installation again.

  • This attempt is scheduled for 1:00p on 2/7/2012, the RMX is scheduled to be down from 1:00p to 3:00p.
  • If the card will not initialize during this two hour time frame, we will return the RMX to the state it was in before the attempt (back to one 40 connection MPM-F card) so the 3:45p classes can be conducted.